Logo
MANUFACTURING IMPROVEMENT MADE EASY BY VORNE
background

Metal Forming and Fabrication

Forming and fabricating metal parts requires a unique combination of force and precision. Whether you are roll forming, slitting, or even welding and cutting, it takes a significant amount of capital investment to operate in this industry. To maintain profitability, metal formers and fabricators must keep a keen eye on cycle times, changeovers, downtime, and quality… all the elements of OEE (Overall Equipment Effectiveness). That is why OEE is considered essential to the industry.

Metal manufacturers rely on automated production monitoring systems like Vorne XL to provide visibility into their process so they can intervene when necessary. Historical production data and trends on over 100 metrics and 20+ data dimensions, real-time data displayed on the plant floor, and automated alerts and push notifications will transform your improvement actions from reactive to proactive.

Other benefits of XL that customers love include no software to install, no servers to maintain, no recurring fees, and no contracts. Instead you get unlimited users, free technical support, a 3-year warranty, and free software updates. All in an inexpensive, off-the-shelf product.

Metal forming and fabrication manufacturing facility.

Driving Improvement for Metal Forming and Fabrication

Our metal forming and fabrication customers strive to make parts within tight tolerances and with minimal scrap, as cost-effectively as possible. It is critical to be able to optimize the process while maintaining the product quality and delivery timelines that their customers require.

The Vorne XL Productivity Appliance enables metal forming and fabrication manufacturers to monitor their processes in real time, improve throughput, and maximize efficiency, all while preserving the integrity of their products and manufacturing process. XL drops onto your existing process, making it a quick and easy solution that requires little to no changes on the line. This is a unique and critical advantage of Vorne XL.

Built-in report from Vorne XL showing top down losses, top down trends, and most frequent down reasons in a metal forming plant.

Key Benefits for Metal Forming and Fabrication Manufacturers

Vorne XL is completely agnostic to the type of equipment in your manufacturing process. This is a huge advantage as you can easily apply XL to any process and get the same deep wealth of information. XL includes I/O to integrate with your process, a scoreboard for your operators, and built-in reporting for your managers. Even better, it easily and incrementally scales from machine to enterprise.

Monitor your roll formers, slitters, CNC’s, fine blanking machines, robotic lasers and cutters, press brakes, and other equipment with one solution, quickly seeing benefits such as:

  1. Real-Time Production Rates See real-time run rates and line speeds. Cumulate and trend highly accurate cycle time data over time to understand the impact cycle loss has on your margins.
  2. Automated Email Alerts Metal forming and fabrication equipment tends to be bulky and loud. Ensure the right people are receiving critical line status updates by sending alerts to their phone or email, drawing attention to where it is most needed.
  3. Downtime Pareto Equipment downtime keeps plant managers up at night. The ability to accurately identify and quantify loss by specific reasons and assets enables manufacturers to attack the true source of loss and mitigate it moving forward.
  4. Part Level Data An increase in customer demand may dictate either longer production runs or repeated shorter runs with fast changeovers. Analyze OEE, Six Big Losses, and related TPM metrics to assess which part runs best on which line, changeover effectiveness, and labor efficiency, finding your sweet spot for production efficiency, inventory turns, and profitability.
  5. Industrial Plant Floor Display An integrated plant floor scoreboard with vibrant, clear, and precise KPIs ensures your operators are aligned with planning and management. Promote ownership of the line and foster communication between teams in order to minimize downtime and “win” the shift.

You're In Excellent Company

Vorne XL customers span across 45+ countries and are in virtually every industry - including many in metal forming and fabrication. Take a look at a sampling of metal forming and fabrication manufacturers that have unlocked the benefits of XL to obtain accurate and actionable data, critical insights, and a foundation for their continuous improvement programs.

New Mather Metals
Waelzholz
Ajax
Haynes
Luvata
Gh Metal
Wieland
Varbros
Olympic Steel
Major Metals
New Mather Metals
Waelzholz

Learn More About Vorne XL

We would be happy to show you XL, deep dive into your challenges and your processes, and answer any questions you may have. We also offer free 90-day trials. In fact, we have completed thousands of successful XL trials. Did you know that 92.8% of companies that try XL buy XL?

Metrics, Dimensions, and Dashboards

Vorne XL provides you with an incredible data foundation and an outstanding suite of reporting tools to effectively drive your continuous improvement, lean manufacturing, and digital transformation initiatives. With XL you get immediate access to over 100 highly accurate and actionable metrics and 20 data dimensions - in real time and for deep retrospective analysis through historical reporting. There are dozens of built-in reports, and you can easily create your own reporting dashboards.

Dashboard from the Vorne XL reporting system showing real-time KPIs for a Blanking line.

Vorne XL User Success Stories

XL helps manufacturers in almost every industry improve their process productivity. You will love our free support, free software updates, 3-year warranty, transparent pricing, fast implementation, and of course, the wealth of product features. That is why we have so many customers that share their success stories.

146%
OEE Improvement
W.M. | Operations Manager | Food Manufacturing PlantI've used Vorne XL in my last three roles and it has really made a difference. When I joined my last plant our OEE was 30%. Each month we picked a focus metric from the XL and trained the team on that metric. I showed everyone how it affected the line and then we worked together to drive up the number. We steadily improved, and when I left the plant our OEE was 74%!
8%
Increase in Throughput
D.M. | Manufacturing Engineer | Seat Frame SupplierHaving real-time production data on the plant floor has really changed how we work. We now know exactly where we should be relative to goal and have seen a remarkable, sustained 8% increase in throughput as a result. Our shifts now compete on a daily basis to try and out-produce the other shifts. Not only does this help us increase productivity, it makes it really fun for the teams.
30%
Sustained Production Increase
R.K. | Maintenance Supervisor | Decorative Can and Tin ManufacturerThe results are amazing! We went from about eight thousand units a day to just over eleven thousand just by putting the displays up. That's an almost 30 percent increase in production and we've been able to sustain our gains. Everybody in the plant just loves the displays. Supervisors, managers and operators now have a great tool for monitoring the progress of the lines in real-time.
Great
Software
Ken M. | Plant Manager | Mining and MetalsVorne has helped us identify issues within our facility giving us the information we needed to invest in those areas to improve our business. The customer service team is very helpful and quick to respond.
93.8%
Downtime Reduction
S.T. | Plant Engineer | International Glass Products ManufacturerThe Vorne displays definitely generate a competitive interest on the plant floor. Until we put the displays up it was not uncommon to see 160 minutes of shift downtime. Now that operators can see the downtime in real time it is down to just 10 or 12 minutes per shift. Also, one of our production shifts just broke the all-time run rate for the line.
Over 100%
Of Target
C.P. | Lean Coordinator | Global Aluminum Products ManufacturerWe absolutely love XL! We show our monthly goal and what has actually been produced. As a matter of fact, last month we beat our production goal. The Vorne display played a significant role in our ‘win’ because it helps us to keep everyone focused on what needs to be done. What a great tool!
100%
ROI In 3 Days
T.M. | Manufacturing Engineer | Automotive Interior SupplierYour displays paid for themselves in just three days of production! We went from an average of 70% throughput to an amazing 98% in just a couple days. Now we finish every part that we make instead of burying pallet loads in the warehouse for fill in work. Seeing the target in giant numbers has helped everyone in the cell become involved in meeting our goals and has even improved morale.
22%
OEE Improvement
Pascal Bourdages | Plant Manager | NovatechWe have XL on a 90-day trial and have already seen a 22% improvement in our OEE score. We are keeping our trial unit and will be adding our next unit shortly!
100% ROI
In Just Minutes
M.B. | Manufacturing Engineer | Commercial Building Products ManufacturerEach operator in our plant does just a small piece of the completed product and previously had no idea of how their work affects the final output. This was before the displays. Now, anyone can look down the line and see the real-time production output in large numbers. We were truly surprised at the effect the displays had on our productivity. Some areas actually achieved a 20% increase in on-time quota. We have seen gains everywhere we've put the displays and are now convinced of the value. As matter of fact, we've proven 100% payback of the display cost in just minutes of improved productivity!
127%
Target Rate
A.C. | Manufacturing Consultant | Manufacturing Consulting FirmWhen we installed Vorne displays showing target and actual production rates, the target rate for one of the lines was inadvertently set higher than was planned. One of the engineers set the target rate to 180 pcs/min for a part that was scheduled for 140 pcs/min. A few hours later when the plant manager glanced at the display, he was amazed to see the actual performance at 178 pcs/min. The line was running at 127% of plan simply because the goal was there! The Vorne displays showed us that our team members can outperform our own expectations. After we started visual management using the Vorne displays, the lines are showing record productivity numbers.
146%
OEE Improvement
W.M. | Operations Manager | Food Manufacturing PlantI've used Vorne XL in my last three roles and it has really made a difference. When I joined my last plant our OEE was 30%. Each month we picked a focus metric from the XL and trained the team on that metric. I showed everyone how it affected the line and then we worked together to drive up the number. We steadily improved, and when I left the plant our OEE was 74%!
8%
Increase in Throughput
D.M. | Manufacturing Engineer | Seat Frame SupplierHaving real-time production data on the plant floor has really changed how we work. We now know exactly where we should be relative to goal and have seen a remarkable, sustained 8% increase in throughput as a result. Our shifts now compete on a daily basis to try and out-produce the other shifts. Not only does this help us increase productivity, it makes it really fun for the teams.

Metal Forming and Fabrication Specialties

Our XL Productivity Appliance, with its fully integrated OEE reporting system, works well across an extremely broad range of metal forming and fabrication industry specialties. Here are some of the more common specialty areas where XL is used:

  • 3D Printing
  • Additive Manufacturing
  • Coil Processing
  • Cutting and Shearing
  • Die Casting
  • Extrusion
  • Forging
  • Heat Treatment
  • Laser Cutting
  • Metal Bending and Forming
  • Metal Cutting, Punching, and Welding
  • Metal Grinding and Polishing
  • Metal Rolling and Spinning
  • Metal Surface Finishing
  • Plasma Arc Welding and Cutting
  • Roll Forming
  • Sheet Metal Stamping
  • Shot Blasting
  • Tube Bending
  • Waterjet Cutting
What's included in your 90-day free trial?
Andon Report
VORNE XL | Works with any machine, any process, right out of the boxEasy, quick self-install | Accurate, real-time KPIs immediatelyTry XL for FREE today
GET STARTED